Back to Case Studies
Case Studies

Norlat Manufacturing: scaling capacity without losing control

A scaling manufacturer watched lead times grow as systems fragmented. Mingrui delivered end-to-end process redesign and stack integration, cutting delivery lead time by 38%.

Norlat Manufacturing (fictional)Advanced Manufacturing
Schedule a Call
Result
38%

Average delivery lead time reduced (demo data)

Norlat Manufacturing: scaling capacity without losing control
Challenge

Fragmented systems during capacity expansion; lead times kept growing

Solution

End-to-end process redesign and technology stack integration

Background

Norlat Manufacturing (fictional) doubled capacity in two years, but orders, scheduling, procurement and QA lived in four disconnected systems. Every expansion made lead times longer, not shorter.

What we did

  • Redesigned the order-to-delivery mainline end to end, removing 11 duplicated approval steps
  • Connected the four systems' critical data through a middleware layer instead of a rip-and-replace
  • Set up a weekly operating cadence and metrics built around lead time

Result

Average lead time dropped 38% within six months (demo data), and for the first time the expansion plan ran ahead of promised delivery dates.

Get Started

Ready to plan
your next move?

Let's talk about your next milestone — and how to reach it

Shen Yizhou
Founding Partner
Schedule a Call

Render diagnostics